The benefits of centralized material handling have been demonstrated for decades, yet somehow the message continues to come slowly to mid-size processors like Jackson Products Inc of St.

Share

The benefits of centralized material handling have been demonstrated for decades, yet somehow the message continues to come slowly to mid-size processors like Jackson Products Inc of St. Louis, Mo. This privately held firm makes personal safety gear for welding, construction, and industrial markets. At its plant in Belmont, Mich., Jackson molds parts for helmets, goggles, visors, and face shields on 21 injection presses from 90 to 720 tons. It uses up to 20 different materials and more than 30 colors.

By Jackson’s estimate it is a successful and profitable molder. But the firm realized that it executed poor management in handling its materials, and this had an impact on everything from efficiency in molding and scheduling to inventory, purchasing, and manpower, says Bob Czarnopis, manufacturing engineer. Over the past year, Jackson has become a convert to central handling and drying, joining what is still a small and exclusive club.

 

Internal audit reveals waste

Until last year, Jackson delivered material to each press independently, using wands stuffed into gaylords and beside-the-press dryers. Numerous inefficiencies resulted. Multiple dryers were running the same resin. Some presses pulled the same material from multiple gaylords. Misplaced inventory was common. “Unfinished boxes of material, which could have been used on another job at another press, instead went into inventory unlabeled or improperly labeled, making them hard to find for future use,” recalls Czarnopis.

Presses ran short of material. Bad parts were scrapped because of contaminated materials, use of the wrong material, and improper drying or color blending. A good deal of housekeeping was required around the machine for resin storage. The clutter around the presses caused inefficient use of floor space and possible safety hazards.

There were maintenance problems, too. Jackson had 10 press-side dryers and conveying systems that moved resins from the gaylord to the dryer or hopper. Upkeep of filters, electric motors, and conveying lines were frequent issues.

 

Savings came quickly

An in-house audit of its operations convinced Jackson to centralize its material handling and drying, a choice that is still quite rare, according to Gord Kaye, system group manager at Wittmann Inc., Torrington, Conn. “Approximately 55% of U.S. molders use central material handling, but only 3% to 5% centralize both handling and drying,” says Kaye.

Jackson invested $250,000 for material-handling equipment from Wittmann and for refurbishing the mezzanine where the system is installed. There is now a dedicated material line at every press to transport HDPE and a second line at each machine for any other material required. One central dryer delivers dry air to eight drying hoppers that were formerly used beside the presses. Each hopper has its own heater for independent temperature control. Materials are conveyed pneumatically to the machines from the drying hoppers or surge bins. The system moves about 600 lb/hr.

Jackson installed the system last April and expects an R.O.I. of 14 to 16 months. Quick savings came from upsizing its material purchases from gaylord to silo quantities. “Switching to bulk amounts immediately trimmed resin costs by 3¢ to 5¢/lb,” says Czarnopis. Better resin usage through improved handling and drying boosted total savings to approximately 20¢/lb.

Central handling and drying helped cut material inventory. “We eliminated 27 warehouse locations and material storage at the molding machines,” says Czarnopis. That left room to move mold storage from a central location to positions by the press, easing tool changes.

The central system also reduced the potential for resin spills. It brought about more accurate inventory control, better drying, and reduced downtime. Less tow-motor traffic through the plant improved worker safety. And one dedicated materials-handling person per shift was no longer needed.

Next, Jackson plans to program the system to start up drying before the first shift arrives. “We also want to see how we can automatically control shutdown at the end of the week to minimize inventory of dried resin at the machines,” says Czarnopis. 

Related Content

Resin Conveying

Redesigned Rotary Level Indicator

Red enclosure now rotates once installed to help ensure conduit entries are always pointed toward the ground, mitigating the risk of moisture damaging internal components.  

Read More
NPE

Resin-Selection Station Conveys Material on Demand

NPE2024: Powerful, space- and labor-saving station makes the connections and conveys material automatically on command.  

Read More
Resin Conveying

Conair Names New Execs in Sales, Systems, Product Management and Extrusion

Moves aimed at strengthening customer focus, market awareness, and technical expertise in key areas of our business.  

Read More
Resin Conveying

‘Digitalization’ – Awkward Term for a Vital Concept

At K 2022, 85 machines from 40 companies showed off their Industry 4.0 capabilities via OPC-UA interface. A new universal interface for Material Supply Systems was revealed at the show.

Read More

Read Next

sustainability

Lead the Conversation, Change the Conversation

Coverage of single-use plastics can be both misleading and demoralizing. Here are 10 tips for changing the perception of the plastics industry at your company and in your community.

Read More
Biopolymers

Why (and What) You Need to Dry

Other than polyolefins, almost every other polymer exhibits some level of polarity and therefore can absorb a certain amount of moisture from the atmosphere. Here’s a look at some of these materials, and what needs to be done to dry them.

Read More