New Guide Offers Tips on Speeding Changeovers

27. August 2014


Time, as the old adage goes, is money. This is certainly true for custom processors, who in large part are able to pay their bills based on how quickly they are able to transition from one job to the next. It makes no difference whether you are involved in injection molding, extrusion, blow molding or any other process; you don't make money if your not making parts.


There’s some help along the way. Check out  How to Reduce Changeover Time and Increase Throughput, available on line from Polymer Ohio and its subsidiary, OH!Manufacturing.


Does $1.8 million sound like a lot of cash. According to the guide, that's what it costs for a one-hour daily changeover on a fairly significant packaging project with the line running 240 days per year. Many manufacturers don’t even realize how much money is slipping out the door because they aren’t measuring properly. Maybe there are techniques where you can cut that time in half.


Can you improve your changeover procedures? Click here and download the PDF.

Comments are reviewed by moderators before they appear to ensure they meet Plastic Technology’s submission guidelines.
blog comments powered by Disqus
Bayer MaterialScience is now Covestro. The spirit of our first 150 years will drive the vision of our next 150.
Additive Conference


All rights reserved. Copyright © Gardner Business Media, Inc. 2015 Cincinnati, Ohio 45244