Let’s look at the ramifications of not having a central system – and think about the associated costs – can you estimate your yearly losses from these problems?

If not, help is available. Go to: www.novatec.com/review to register for either a free consultation or a complete plant survey.

It is not unusual to discover tens of thousands – even hundreds of thousands of wasted dollars in a plant without a good centralized resin handling system.

PROBLEMS = LOST PRODUCTION TIME, LOST PROFITS AND LOST CUSTOMERS!

Problems Experienced Without a Central System:

  • Space needed for plant consolidation

               If you can’t handle more process machines some other plant will

  • Congestion on the floor around machines

               Slows workers – increases spillage and chance of injury

  • Lack of material validation/verification 

               Can’t bid on contracts where validation required

  • Wrong material going to wrong machine

               Lost production time, rejects and lost material

  • High material spillage

               Loss of material and labor + safety hazard

  • Material related part defects

               Producing scrap instead of saleable parts

  • High maintenance/labor costs

               Increased payroll and parts cost

  • Frequent material changes

               Lost production time

  • Inefficient work flow

               Wastes space and labor

  • Lack of Automation               

               Adds labor costs and extends lead times

  • Constrained production capacity

               Can’t increase revenue

  • Lengthy hopper cleanout times

               Increased labor - lost production

  • Poor drying of material

               Rejected parts – lost customers

Usually, the cost to install or upgrade an efficient resin handling system is recovered in a matter of months – not years – See examples of central system paybacks. Investment payback in Months – Not Years but a review of conditions in your plant is required to identify areas of loss and possible remedies.

LEARN MORE

Visit:

Zones

Ask the Expert

Ask application engineers your specific question

Jim Zinski - V.P System Design, Novatec, Inc.

Visit Novatec at NPE2012

PT Home | Zones | Suppliers | Materials Search | Articles | Resin Prices | Blog | e-Newsletters | Subscribe | Contact Us

© 2012 Gardner Publications, Inc

Contact Us | About Us | Advertise

[ Log On ]