Paratherm Moves to New Headquarters
Less than 2 miles from the former location, with more lab and conference space.
Paratherm, supplier of heat-transfer fluids, has moved from W. Conshohocken, Pa., to King of Prussia, Pa., less than 2 miles away. The new facility has twice as much lab space with new automated testing equipment that offers increased speed and accuracy. There is also a large auditorium for group meetings and training sessions. New phone number is (610) 314-7080.
Related Content
-
Descaling Pump Cleans Heating and Cooling Circuits
Mouldpro’s compact and portable descaling pump keeps heating and cooling circuits on molds and molding machines clear of rust and limescale deposits.
-
How to Reduce Sinks in Injection Molding
Modifications to the common core pin can be a simple solution, but don’t expect all resins to behave the same. Gas assist is also worth a try.
-
Is Your Water System Setup Helping or Hurting Your Molding Plant Productivity?
The plant water system is a critical component of an injection molding facility. A poorly designed or maintained water-cooling system can have a serious impact on production efficiency and cause many maintenance issues. Here’s what you need to know — and ask — to prevent those problems.